An order placed is not an order followed. We handle placement, chasing, progress reports and early warning of any slip — in the factory’s language and on its time zone, while you work on yours.

2
annual factory shutdowns built into the schedule from the outset
0h
time difference for you: we work to your business hours
Slippage
flagged the moment it appears, never on the delivery date
  1. 01

    Placement

    Order formalised with the specification fixed, the payment schedule, the Incoterm and the agreed quality thresholds. What is written at this point is what can be required later.

  2. 02

    Chasing and progress

    A Chinese order book is not managed by one email a month. Regular follow-up keeps your order in its place in the queue, before a delay becomes impossible to recover.

  3. 03

    Alert and arbitration

    Material shortage, line delay, deviation on a sample: you hear about it while correction is still possible, with the options and their consequences.

Assembly line of refrigerated counters
Air conditioner assembly line, units lined up before packing
Household appliance production line
Assembly station in a workshop, parts being put together
Textile production machine with a roll of material running
Overall view of a production workshop, lines and material stock
  • Order formalised
  • Regular progress reports
  • Deviations flagged early
  • Schedule kept current
  • Arbitration with the factory
  • Coordinated with inspection

An order followed or an order merely placed

Without follow-upWith follow-up on site
Schedule slipFound out on the due dateFlagged as it appears
Material substitutionDiscovered on arrivalSettled before production
Place in the order bookWhatever you are givenHeld by regular chasing
Chinese New YearEnduredBuilt into the plan

Frequently asked questions

How often do we hear back?
It depends on the length of production and its critical stages: a simple three-week order does not call for the same rhythm as a development running several months. We agree the rhythm at the start, and you are told immediately in the event of a deviation rather than at the next scheduled point.
Can you follow an order already under way?
Yes. We pick the file up as it stands, establish real progress with the factory and hand you a clear position. It is a common request once a lead time starts slipping and answers become vague.
What do you do if the factory falls behind?
We first find the real cause on site — material, workload, subcontracting — then the options: reordering the lines, partial shipment, a change of transport mode to recover part of the delay. You arbitrate on costed options, not on a bare announcement of delay.

A production run to follow?

Tell us where your order stands and what worries you. We pick the file up wherever it is.

Each service can be commissioned on its own, or alongside the others.